MAKE |
MODEL |
H.P. |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
New Holland |
C227 |
74 |
2,700 lbs. |
$300 |
$900 |
$2,700 |
New Holland |
C237 |
74 |
3,700 lbs. |
$375 |
$1,100 |
$3,300 |
New Holland |
C238 |
90 |
3,800 lbs. |
$425 |
$1,250 |
$3,750 |
New Holland |
C238 Hi Flow |
90 |
3,800 lbs. |
$475 |
$1,425 |
$4,275 |
New Holland |
C245 Hi Flow |
90 |
4,500 lbs. |
$475 |
$1,425 |
$4,275 |
New Holland |
C327 |
74 |
2,700 lbs. |
$300 |
$900 |
$2,700 |
New Holland |
C337 |
74 |
3,700 lbs. |
$375 |
$1,100 |
$3,300 |
New Holland |
C345 High Flow |
90 |
4,500 lbs. |
$475 |
$1,425 |
$4,275 |
GEHL |
RT215 |
72 |
2,150 lbs. |
$300 |
$900 |
$2,700 |
GEHL |
V320 Hi Flow |
114 |
4,570 lbs. |
$475 |
$1,425 |
$4,275 |
MAKE |
MODEL |
H.P. |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
New Holland |
L321 |
74 |
2,100 lbs. |
$225 |
$675 |
$1,925 |
New Holland |
L328 |
74 |
2,800 lbs. |
$250 |
$750 |
$2,250 |
New Holland |
L234 |
90 |
3,400 lbs. |
$285 |
$850 |
$2,500 |
New Holland |
L234 High Flow |
90 |
3,400 lbs. |
$350 |
$1,000 |
$3,000 |
GEHL |
R220 |
72 |
2,200 lbs. |
$225 |
$1,475 |
$4,275 |
GEHL |
V420 |
120 |
4,200 lbs. |
$475 |
$1,475 |
$4,275 |
DESCRIPTION |
DAY |
WEEK |
4 WEEK |
|
Hydraulic Auger w/1 bit |
$125 |
$300 |
$900 |
Extra Bit |
$50 |
$150 |
$450 |
Auger Extensions |
$15 |
$45 |
$135 |
Rammer 555 Hydraulic Hammer |
$195 |
$585 |
$1,750 |
Rammer 777 Hydraulic Hammer |
$250 |
$750 |
$2,250 |
Pallet Forks 48" |
$35 |
$100 |
$300 |
AMI Mat Grapple Forks 72" |
$125 |
$350 |
$1,050 |
Bradco 640 Trencher |
$150 |
$450 |
$1,350 |
Bradco Scrap Grapple Bucket 83" |
$125 |
$350 |
$1,050 |
Rock Bucket 84" |
$100 |
$300 |
$900 |
FFC Power Box Rake 90" |
$150 |
$450 |
$1,350 |
FFC Auto Rake 76" |
$200 |
$585 |
$1,750 |
FFC Roto-Tiller 68" |
$200 |
$585 |
$1,750 |
Domor SSHA DuraGrader 72" |
$200 |
$585 |
$1,750 |
Sweepster Pick Up Broom 72"* |
$150 |
$450 |
$1,350 |
Sweepster Angle Push Broom 84"* |
$150 |
$450 |
$1,350 |
Bradco Brush Cutter 72"* |
$200 |
$585 |
$1,750 |
Hard Rubber Tires** |
$75 |
$225 |
$675 |
LaBounty MSD7R Shear*** |
|
$1,250 |
$3,750 |
Burchland Silt Fencer 72" |
$175 |
$575 |
$1,575 |
Vibratory Trench Roller 18" |
$175 |
$575 |
$1,575 |
Fecon BH74SS High Flow Mulcher**** |
$400 |
$1,200 |
$3,600 |
FFC Cold Planer 30" High Flow |
$400 |
$1,200 |
$3,600 |
ProTech 8' Snow Push Box |
|
|
$695 |
Burchland EZR Material Roller |
$150 |
$450 |
$1,350 |
Bradco Dozer Blade 90" |
$200 |
$585 |
$1,750 |
*Bristle wear charged at $125 per inch.
*Customer responsible for damaged blades.
**Installation and damage charges additional.
***10% blade wear surcharge or actual blade wear cost will be added to rate, whichever is greater.
****Customer responsible for broken/missing teeth.
MAKE |
MODEL |
H.P. |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Caterpillar |
420F |
102 |
1.4 yd. Loader, 17' 9" Dig Depth |
$275 |
$850 |
$2,500 |
Caterpillar |
420F IT |
100 |
1.3 yd. Loader, 17' 9" Dig Depth |
$325 |
$1,000 |
$2,950 |
*Bristol wear charged at $125 per inch.
**Customer is responsible for all jumper line damage & repair.
**Customer is responsible for isolator replacement.
***Customer is responsible for greasing hammer at recommended intervals.
***Customer is responsible for all hydraulic hose damage and repair.
***Customer is responsible for all tool repair and damage.
MAKE |
MODEL |
H.P. |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
New Holland |
W80C TC |
82 |
1.44 yds. |
$350 |
$1,050 |
$3,150 |
GEHL |
ALT750 |
74 |
1.5 yds. |
$475 |
$1,250 |
$3,750 |
Hitachi |
ZW150 |
141 |
2.8 yds. |
$465 |
$1,395 |
$4,150 |
Hitachi |
ZW180 |
173 |
3.4 yds. |
$550 |
$1,650 |
$4,950 |
Hitachi |
ZW220 |
200 |
4.2 yds. |
$675 |
$2,000 |
$6,000 |
Hitachi |
ZW250 |
249 |
4.5 yds. |
$800 |
$2,400 |
$7,200 |
Hitachi |
ZW310 |
285 |
5.0 yds. |
$1,000 |
$3,000 |
$9,000 |
Hitachi |
ZW330 |
311 |
6.8 yds. |
$1,175 |
$3,500 |
$10,000 |
Caterpillar |
972M |
298 |
6.25 yds. |
$1,225 |
$3,675 |
$11,000 |
Hitachi |
ZW370 |
389 |
8.1 yds. |
$1,350 |
$4,000 |
$12,000 |
- Hydraulic quick coupler machines available.
DESCRIPTION |
DAY |
WEEK |
4 WEEK |
|
Forks: ZW150/ZW180 |
$95 |
$250 |
$750 |
Forks: ZW220/ZW250 |
$125 |
$350 |
$1,000 |
Forks: ZW310/ZW370 |
$150 |
$450 |
$1,250 |
Pipe Clamp Forks: ZW150/ZW180 |
$350 |
$1,000 |
$2,500 |
Pipe Clamp Forks: ZW310/ZW370 |
$400 |
$1,200 |
$3,500 |
Grapple Forks: ZW150/ZW180 |
$225 |
$675 |
$2,000 |
Grapple Forks: ZW310/ZW370 |
$400 |
$1,200 |
$3,500 |
Angle Broom: ZW150/ZW180* |
$250 |
$750 |
$2,000 |
Jib Boom: ZW150/ZW180 |
$50 |
$150 |
$450 |
Jib Boom: ZW220/ZW250 |
$75 |
$225 |
$675 |
Jib Boom: ZW310/ZW370 |
$125 |
$350 |
$1,000 |
14' Snow Push Box |
|
|
$1,150 |
*Bristle wear charged at $125 per inch.
MAKE |
MODEL |
H.P. |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Caterpillar* |
953K |
148 |
2.42 yds. |
$775 |
$2,300 |
$6,900 |
Caterpillar* |
963K** |
194 |
3.2 yds. |
$1,100 |
$3,175 |
$9,500 |
Caterpillar* |
973D |
263 |
4.2 yds. |
$1,250 |
$3,750 |
$11,250 |
*Listed 4 week rates allow for a maximum of 125 hours. Monthly rentals will be charged 1/125th the monthly rate for every hour of overage.
**Quick coupler unit available w/forks.
ATTACHMENT |
DESCRIPTION |
DAY |
WEEK |
4 WEEK |
|
Pin On Forks |
Cat 953K |
$150 |
$425 |
$1,250 |
Quick Attach Forks |
Cat 963K |
$125 |
$350 |
$1,000 |
Rear Ripper |
Cat 963K |
$175 |
$525 |
$1,575 |
*Installation charges may apply.
MAKE |
MODEL |
H.P. |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Toro |
TRX26 |
26 |
Walk Behind, 4' Depth |
$150 |
$450 |
$1,250 |
Toro |
RT600 |
65 |
Ride-On, 6' Depth |
$500 |
$1,500 |
$4,500 |
Toro |
RT1200 |
121 |
Ride-On, 7' Depth |
$725 |
$2,175 |
$6,500 |
MAKE |
MODEL |
H.P. |
WEIGHT |
DAY |
WEEK |
4 WEEK |
|
Caterpillar |
D3K LGP |
81 |
17,800 lbs. |
$375 |
$1,125 |
$3,375 |
Caterpillar |
D4K LGP |
92 |
18,700 lbs. |
$425 |
$1,250 |
$3,750 |
Caterpillar |
D5K LGP |
100 |
21,300 lbs. |
$500 |
$1,500 |
$4,500 |
Caterpillar |
D6K LGP |
125 |
29,700 lbs. |
$650 |
$1,925 |
$5,750 |
Caterpillar |
D6N LGP |
145 |
40,000 lbs. |
$825 |
$2,475 |
$7,400 |
Caterpillar |
D6T XW |
228 |
46,000 lbs. |
$1,000 |
$3,000 |
$9,000 |
Caterpillar |
D6T XW PAT |
228 |
46,000 lbs. |
$1,000 |
$3,000 |
$9,000 |
Caterpillar |
D6T LGP |
228 |
48,300 lbs. |
$1,100 |
$3,175 |
$9,500 |
Caterpillar |
D6T LGP PAT |
228 |
48,300 lbs. |
$1,100 |
$3,175 |
$9,500 |
Caterpillar |
D7E LGP |
270 |
48,300 lbs. |
$2,075 |
$5,175 |
$15,500 |
Caterpillar |
D8T |
347 |
85,000 lbs. |
|
$5,175 |
$15,500 |
Caterpillar |
D10R |
570 |
146,000 lbs. |
|
|
$27,500 |
- Accugrade and Top Con ready machines available.
MAKE |
MODEL |
H.P. |
SPECS |
DAY |
WEEK |
4 WEEK |
|
Caterpillar |
D5K/LGP |
100 |
Winch Unit |
$925 |
$2,300 |
$6,900 |
Caterpillar |
D6K/LGP |
125 |
Winch Unit |
$1,100 |
$2,750 |
$8,250 |
Caterpillar |
D6N/LGP |
145 |
Winch Unit |
$1,325 |
$3,300 |
$9,900 |
Caterpillar |
D6T XW* |
228 |
Winch Unit |
$1,600 |
$4,000 |
$12,000 |
Caterpillar |
D6T LGP* |
228 |
Winch Unit |
$1,675 |
$4,175 |
$12,500 |
Caterpillar |
D7E LGP |
270 |
Winch Unit |
$2,075 |
$5,175 |
$15,500 |
Caterpillar |
D8T* |
347 |
Winch Unit |
$2,350 |
$5,850 |
$17,500 |
- Units subject to $195 cable inspection upon return.
*Angle blades available.
MAKE |
MODEL |
DAY |
WEEK |
4 WEEK |
|
Caterpillar |
D5K |
$175 |
$525 |
$1,575 |
Caterpillar |
D6N/D6T |
$175 |
$525 |
$1,575 |
Caterpillar |
D8T |
$225 |
$675 |
$2,000 |
- 3D modeling available at additional charge.
- Set-up charge applies.
MAKE |
MODEL |
H.P. |
WEIGHT |
CAPACITY |
DESCRIPTION |
DAY |
WEEK |
4 WEEK |
|
Caterpillar |
D5K LGP |
99 |
21,300 lbs. |
20,000 lbs. |
Midwestern Side Boom M520C |
$675 |
$2,000 |
$6,000 |
Caterpillar |
D6K LGP |
125 |
39,000 lbs. |
40,000 lbs. |
Midwestern Side Boom M540C |
$890 |
$2,675 |
$8,000 |
Caterpillar |
PL61 |
125 |
37,500 lbs. |
40,000 lbs. |
Caterpillar Side Boom |
$890 |
$2,675 |
$8,000 |
- Units subject to $195 cable inspection upon return.
- Customer responsible for any and all cable damage.
- On-site assembly charges may apply.
MAKE |
MODEL |
CAPACITY |
WEEK |
4 WEEK |
|
Bergmann |
C185S |
13.23 |
$2,500 |
$7,500 |
Bell |
B25E |
19 yds. |
$2,700 |
$8,000 |
Bell |
B30E |
22.9 yds. |
$3,000 |
$9,000 |
Bell |
B40E |
30 yds. |
$4,500 |
$13,500 |
Bell |
B45E |
33 yds. |
$4,750 |
$14,500 |
Bell |
B50E |
37 yds. |
$5,000 |
$15,000 |
- Tailgate units available
MAKE |
MODEL |
CAPACITY |
WEEK |
4 WEEK |
|
Bergmann |
C815S |
10.5 yds. |
$2,500 |
$7,500 |
MAKE |
MODEL |
CAPACITY |
WEEK |
4 WEEK |
|
Bell |
B25E |
5,000 gal. Tandem Axle |
$3,500 |
$10,500 |
Bell |
B30E |
6,000 gal. Tandem Axle |
$4,000 |
$12,000 |
MAKE |
MODEL |
SPECS |
DAY |
WEEK |
4 WEEK |
|
Volvo |
SD45D |
54" Drum, Canopy |
$325 |
$925 |
$2,775 |
Bomag |
BW177 |
66" Drum, Canopy or Cab w/AC |
$400 |
$1,175 |
$3,500 |
Volvo |
SD115D |
84" Drum, Cab w/AC |
$500 |
$1,500 |
$4,500 |
Bomag |
BW211 BW213 |
84" Drum, Cab w/AC |
$500 |
$1,500 |
$4,500 |
MAKE |
MODEL |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Caterpillar |
CB24B |
47" Double Drum |
$275 |
$825 |
$2,475 |
MAKE |
MODEL |
SPECS |
DAY |
WEEK |
4 WEEK |
|
Volvo |
SD45F* |
54" Padfoot Single Drum, Canopy |
$350 |
$975 |
$2,925 |
Volvo |
SD70* |
66" Padfoot Single Drum, Canopy or Cab w/AC |
$450 |
$1,350 |
$4,050 |
Bomag |
BW177* |
66" Padfoot Single Drum, Cab w/AC |
$450 |
$1,350 |
$4,050 |
Volvo |
SD115* |
84" Padfoot Single Drum, Cab w/AC |
$550 |
$1,650 |
$4,850 |
Caterpillar |
815F2 |
39" Padfoot Four Drum, Cab w/AC |
$1,350 |
$4,000 |
$12,000 |
*Hydraulic pushblade units available.
MAKE |
MODEL |
H.P. |
WEIGHT |
DAY |
WEEK |
4 WEEK |
|
Kobelco |
SK85CS* |
56 |
18,700 lbs. |
$425 |
$1,250 |
$3,750 |
Kobelco |
SK140SR LC* |
105 |
31,500 lbs. |
$500 |
$1,500 |
$4,500 |
Kobelco |
SK140SR LC w/Rubber Track Pads* |
105 |
31,500 lbs. |
$635 |
$1,900 |
$5,350 |
Kobelco |
SK140SR LC w/Offset Boom* |
94 |
32,040 lbs. |
$575 |
$1,675 |
$5,000 |
Kobelco |
SK170 LC |
134 |
38,800 lbs. |
$575 |
$1,675 |
$5,000 |
Kobelco |
SK170 LC w/Rubber Track Pads* |
134 |
38,800 lbs. |
$700 |
$2,100 |
$5,850 |
Kobelco |
SK210 LC |
166 |
48,500 lbs. |
$675 |
$2,000 |
$6,000 |
Kobelco |
SK260 LC |
185 |
59,300 lbs. |
$850 |
$2,500 |
$7,500 |
Kobelco |
SK270SR |
166 |
60,000 lbs. |
$850 |
$2,500 |
$7,500 |
Kobelco |
SK300 LC |
268 |
68,100 lbs. |
$950 |
$2,850 |
$8,500 |
Caterpillar |
328D LCR |
204 |
84,000 lbs. |
$1,075 |
$3,175 |
$9,500 |
Kobelco |
SK350 LC |
286 |
83,300 lbs. |
$1,075 |
$3,175 |
$9,500 |
Kobelco |
SK500 LC |
369 |
114,000 lbs. |
$1,500 |
$4,500 |
$13,500 |
Kobelco |
SK850 LC |
500 |
177,000 lbs. |
|
|
$25,000 |
*Push blade and rubber pad units available.
- Additional fee to weld plate over teeth.
MAKE |
MODEL |
H.P. |
WEIGHT |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Kobelco |
SK17SR |
15 |
3,650 lbs. |
7'1" Dig Depth |
$200 |
$600 |
$1,800 |
Kobelco |
SK35SR |
28 |
7,960 lbs. |
10'1" Dig Depth |
$250 |
$750 |
$2,250 |
Kobelco |
SK45SR |
39 |
10,300 lbs. |
11'3" Dig Depth |
$275 |
$825 |
$2,475 |
Kobelco |
SK55SRX Open ROPS |
39 |
11,600 lbs. |
12'10" Dig Depth |
$250 |
$750 |
$2,250 |
Kobelco |
SK55SRX |
39 |
12,295 lbs. |
12'10" Dig Depth |
$300 |
$900 |
$2,700 |
MAKE |
MODEL |
H.P. |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Kobelco |
SK210 LC |
157 |
50 ft. Reach |
$1,075 |
$3,175 |
$9,500 |
Kobelco |
SK260 LR |
178 |
60 ft. Reach |
$1,175 |
$3,500 |
$10,500 |
Kobelco |
SK300 LC |
204 |
63 ft. Reach |
$1,400 |
$4,175 |
$12,500 |
- Units subject to bucket pin & bushing inspection upon return.
- Customer responsible for excessive bucket pin & bushing wear.
MAKE |
MODEL |
H.P. |
WEIGHT |
DAY |
WEEK |
4 WEEK |
|
Caterpillar |
M315D |
145 |
35,500 lbs. |
$785 |
$2,350 |
$7,000 |
Caterpillar |
M322D |
173 |
47,400 lbs. |
$1,075 |
$3,200 |
$9,500 |
HItachi |
ZX220W-3 |
159 |
59,888 lbs. |
$1,075 |
$3,200 |
$9,500 |
- Twist-O-Wrist bucket available.
- Hydraulic hammer available.
MAKE |
MODEL |
H.P. |
WEIGHT |
ATTACHMENT |
DAY |
WEEK |
4 WEEK |
|
Kobelco |
SK55SRX |
39 |
12,295 lbs. |
Hydraulic Thumb |
$375 |
$1,075 |
$3,250 |
Kobelco |
SK85CS |
56 |
18,700 lbs. |
Hydraulic Thumb |
$450 |
$1,350 |
$4,050 |
Kobelco |
SK140SR LC |
105 |
31,500 lbs. |
Hydraulic Thumb/Grapple |
$635 |
$1,900 |
$5,350 |
Kobelco |
SK170 LC |
134 |
38,800 lbs. |
Hydraulic Thumb/Grapple |
$750 |
$2,175 |
$6,500 |
Kobelco |
SK210 LC |
166 |
49,400 lbs. |
Hydraulic Thumb/Grapple |
$850 |
$2,500 |
$7,500 |
Kobelco |
SK260 LC |
185 |
56,890 lbs. |
Hydraulic Thumb/Grapple |
$1,050 |
$3,125 |
$9,375 |
Kobelco |
SK270SR |
166 |
60,000 lbs. |
Hdraulic Thumb/Grapple |
$1,050 |
$3,125 |
$9,375 |
Kobelco |
SK300 LC |
268 |
68,000 |
Hydraulic Thumb/Grapple |
$1,200 |
$3,600 |
$10,500 |
Kobelco |
SK350 LC |
286 |
83,300 lbs. |
Hydraulic Thumb/Grapple |
$1,300 |
$3,850 |
$11,500 |
Kobelco |
SK500 LC |
369 |
114,000 lbs. |
Hydraulic Thumb/Grapple |
|
|
$16,500 |
- Customer is responsible for all damage and excessive wear to thumbs/grapples.
- Tire chains available for an additional $1,000/4-weeks
MAKE |
MODEL |
H.P. |
ATTACHMENT |
WEEK |
4 WEEK |
|
Kobelco |
SK140SR LC |
105 |
AMI GR3345 |
$2,500 |
$7,500 |
Kobelco |
SK210 LC |
150 |
AMI GR3345 |
$3,250 |
$9,500 |
Kobelco |
SK270SR LC |
160 |
AMI GR3345 |
$3,675 |
$11,000 |
KObelco |
SK260 LC |
178 |
AMI GR4580 |
$3,850 |
$11,500 |
- Customer is responsible for all damage, excessive wear & jumper line damage.
MAKE |
MODEL |
H.P. |
WEIGHT |
ATTACHMENT |
WEEK |
4 WEEK |
|
Kobelco |
SK85CS |
56 |
18,700 lbs. |
MSD7R |
$2,300 |
$6,850 |
- Customer is responsible for all jumper line damage and repair.
- Price does not include blade wear, tooth wear and maintenance.
- 10% blade wear surcharge or actual blade wear cost will be added to rate, whichever is greater.
MAKE |
MODEL |
H.P. |
WEIGHT |
ATTACHMENT |
WEEK |
4 WEEK |
|
Kobelco |
SK210 LC |
166 |
48,500 lbs. |
MSD1500R |
$7,000 |
$14,000 |
Kobelco |
SK350 LC |
286 |
83,300 lbs. |
MSD2500R |
$10,750 |
$21,500 |
Kobelco |
SK500 LC |
369 |
114,000 lbs. |
MSD3000R |
$12,000 |
$24,000 |
- Customer is responsible for all jumper line damage and repair.
- Price does not include blade wear, tooth wear and maintenance.
- 10% blade wear surcharge or actual blade wear cost will be added to rate, whichever is greater.
MAKE |
MODEL |
H.P. |
WEIGHT |
ATTACHMENT |
WEEK |
4 WEEK |
|
Kobelco |
SK350 LC |
286 |
83,300 lbs. |
AMI |
$4,500 |
$13,500 |
- Price does not include blade wear or tooth wear.
- Pipe shoe(s) not included.
MAKE |
MODEL |
H.P. |
WEIGHT |
ATTACHMENT |
DAY |
WEEK |
4 WEEK |
|
Kobelco |
SK55SRX |
39 |
12,295 lbs. |
Rammer 777 |
$495 |
$1,485 |
$4,450 |
Kobelco |
SK85CS |
56 |
18,700 lbs. |
Rammer 999 |
$625 |
$1,875 |
$5,675 |
Kobelco |
SK140SR LC |
105 |
31,500 lbs. |
Rammer 1655 |
$925 |
$2,750 |
$8,250 |
Kobelco |
SK170SR LC |
134 |
38,800 lbs. |
Rammer 1655 |
$975 |
$2,925 |
$8,750 |
Kobelco |
SK210 LC |
166 |
48,500 lbs. |
Rammer 2166 |
$1,275 |
$3,825 |
$11,450 |
Kobelco |
SK270SR LC |
166 |
60,000 lbs. |
Rammer 2166 |
$1,400 |
$4,225 |
$12,700 |
Kobelco |
SK260 LC |
185 |
56,890 lbs. |
Rammer 2577 |
$1,600 |
$4,725 |
$14,250 |
Kobelco |
SK300 LC |
268 |
68,100 lbs. |
Rammer 3288 |
|
$5,850 |
$17,500 |
Kobelco |
SK350 LC |
286 |
83,300 lbs. |
Rammer 3288 |
|
$6,175 |
$18,500 |
Kobelco |
SK500 LC |
369 |
114,400 lbs. |
Rammer 4099 |
|
$8,150 |
$24,500 |
- Add $1,000/mo. for underwater kit.
- Customer is responsible for greasing hammer at recommended intervals.
- Customer is responsible for all hydraulic hose damage and repair.
- Customer is responsible for all tool repair and damage.
MAKE |
MODEL |
H.P. |
WEIGHT |
ATTACHMENT |
DAY |
WEEK |
4 WEEK |
|
Kobelco |
SK85CS |
56 |
18,700 lbs. |
McMillen Auger |
$575 |
$1,675 |
$5,000 |
Kobelco |
SK140SR |
105 |
31,500 lbs. |
Premier Auger |
$850 |
$2,500 |
$8,000 |
Kobelco |
SK170SR LC |
134 |
38,800 lbs. |
McMillen Auger |
$900 |
$2,675 |
$8,000 |
Kobelco |
SK210LC |
166 |
48,500 lbs. |
Premier Auger |
$1,000 |
$3,000 |
$9,000 |
MAKE |
MODEL |
H.P. |
WEIGHT |
ATTACHMENT |
DAY |
WEEK |
4 WEEK |
|
Kobelco |
SK55SRX |
39 |
12,295 lbs. |
Allied Ho-Pac 500B |
$400 |
$1,200 |
$3,600 |
Kobelco |
SK85CS |
56 |
18,700 lbs. |
Allied Ho-Pac 1000B |
$525 |
$1,575 |
$4,775 |
Kobelco |
SK140SR LC |
105 |
32,100 lbs. |
Allied Ho-Pac 1600VMS |
$675 |
$2,085 |
$6,250 |
Kobelco |
SK170SR LC |
134 |
38,800 lbs. |
Allied Ho-Pac 1600VMS |
$800 |
$2,425 |
$7,250 |
Kobelco |
SK210 LC |
166 |
49,400 lbs. |
Allied Ho-Pac 2300VMS |
$900 |
$2,750 |
$8,250 |
Kobelco |
SK270SR LC |
166 |
60,000 lbs. |
Allied Ho-Pac 2300VMS |
$1,075 |
$3,250 |
$9,750 |
Kobelco |
SK260 LC |
185 |
56,890 lbs. |
Allied Ho-Pac 2300VMS |
$1,075 |
$3,250 |
$9,750 |
Kobelco |
SK300 LC |
268 |
68,100 lbs. |
Allied Ho-Pac 4000VMS |
|
$3,700 |
$11,000 |
Kobelco |
SK350 LC |
286 |
83,300 lbs. |
Allied Ho-Pac 4000VMS |
|
$4,025 |
$12,000 |
- Customer is responsible for all jumper line damage and repair.
- Customer is responsible for isolator replacement.
MAKE |
MODEL |
H.P. |
WEIGHT |
ATTACHMENT |
DAY |
WEEK |
4 WEEK |
|
Kobelco |
SK85CS |
56 |
18,700 lbs. |
Blue Diamond 50" |
$650 |
$1,925 |
$5,750 |
- Customer is responsible for all jumper line damage and repair.
- Price does not include blade wear and maintenance.
MAKE |
MODEL |
H.P. |
WEEK |
4 WEEK |
|
Kobelco |
SK300 |
268 |
$4,350 |
$13,000 |
Kobelco |
SK350 |
286 |
$4,675 |
$14,000 |
- Customer is responsible for all damage, excessive wear & jumper line damage.
MAKE |
MODEL |
H.P. |
WEEK |
4 WEEK |
|
Kobelco |
SK300 |
268 |
$4,350 |
$13,000 |
Kobelco |
SK350 |
286 |
$4,675 |
$14,000 |
*Customer is responsible for all damage, excessive wear & jumper line damage.
MAKE |
MODEL |
CAPACITY |
WEEK |
4 WEEK |
|
IHI |
IC35 |
6,614 lbs. |
$850 |
$2,700 |
Bergmann |
C912S |
11,000 lbs. |
$4,000 |
$12,000 |
Morooka |
MST1500VD |
13,890 lbs. |
$2,350 |
$7,000 |
Morooka |
MST2200VD |
22,046 lbs. |
$3,000 |
$9,000 |
Morooka |
MST3000VD |
33,100 lbs. |
$4,000 |
$12,000 |
Configurations available for Morooka track trucks:
- Flatbeds
- Enclosed Personnel Carriers
- 360 Degree Rotating Dumpers
- Mounted Air Compressor
- Mounted Welders
- Mounted Sandblasters
- Mounted Vacuums
- Mounted Fuel Tankers
- Mounted Straw Blowers
- Mounted Seeders
MAKE |
MODEL |
CAPACITY |
WEEK |
4 WEEK |
|
Morooka |
MST1500VD |
13,890 lbs. |
$2,350 |
$7,000 |
Morooka |
MST2200VD |
22,046 lbs. |
$3,000 |
$9,000 |
MAKE |
MODEL |
CAPACITY |
WEEK |
4 WEEK |
|
Morooka |
MST1500VD |
Seats 10 |
$2,850 |
$8,500 |
MAKE |
MODEL |
CAPACITY |
WEEK |
4 WEEK |
|
Morooka |
MST1500VD |
13,890 lbs. |
$3,175 |
$9,525 |
Morooka |
MST2200VD |
22,046 lbs. |
$4,025 |
$11,525 |
MAKE |
MODEL |
CAPACITY |
WEEK |
4 WEEK |
|
Morooka |
MST1500VD |
500 Gal. |
$38,500 |
$11,500 |
MAKE |
MODEL |
WEEK |
4 WEEK |
|
Morooka |
MST2200VD |
$5,000 |
$15,000 |
MAKE |
MODEL |
H.P. |
SPECS |
DAY |
WEEK |
4 WEEK |
|
New Holland |
Workmaster 50 |
53 |
Wheeled w/Loader |
$275 |
$800 |
$2,400 |
New Holland |
T4.75 |
74 |
Wheeled |
$300 |
$900 |
$2,700 |
New Holland |
T6.165 |
135 |
Wheeled |
$500 |
$1,500 |
$4,500 |
New Holland |
T7.190 |
150 |
Wheeled |
$550 |
$1,650 |
$4,950 |
New Holland |
T8.380 |
311 |
Wheeled Unit |
$850 |
$2,500 |
$7,500 |
New Holland |
T9.390 |
340 |
Wheeled |
$850 |
$2,500 |
$7,500 |
Challenger |
MT755D/MT765D |
327 |
Rubber Tracks |
$900 |
$2,700 |
$8,000 |
New Holland |
T9.530 |
407 |
Wheeled |
|
$3,850 |
$11,500 |
New Holland |
T9.600 |
535 |
Wheeled |
|
$4,175 |
$12,500 |
MAKE |
MODEL |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Youngs Welding |
4048 Roller |
2-48" Padfoot Drums, 40" dia. Tow Behind |
$200 |
$600 |
$1,800 |
MAKE |
MODEL |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Woods |
DMH6N |
6' wide, 3 pt. mount |
$155 |
$465 |
$930 |
Rome |
OT-10 |
10' wide, 24" Blades |
$275 |
$800 |
$2,400 |
Rome |
TAW20S |
9', 6" wide, 32" Blades |
$350 |
$1,100 |
$3,300 |
Rome |
TACW-16 |
11' wide, 32" Blades |
$400 |
$1,200 |
$3,600 |
Rome |
TRCW-16 |
12' 6" wide, 42" Blades |
$600 |
$1,800 |
$5,400 |
Kuhn |
7300 |
12' wide, 22" Blades |
$400 |
$1,200 |
$3,600 |
John Deere |
630 |
26' wide, 22" Blades |
$400 |
$1,200 |
$3,600 |
MAKE |
MODEL |
SPECS |
DAY |
WEEK |
4 WEEK |
|
Land Pride |
CR2572 |
6' wide, 6" Spacing |
$125 |
$350 |
$1,050 |
Bowie |
Crimp Disc |
8' wide, 6" Spacing |
$175 |
$500 |
$1,500 |
Burchland |
SCX |
8' wide, 8" Spacing |
$175 |
$500 |
$1,500 |
MAKE |
MODEL |
SPECS |
DAY |
WEEK |
4 WEEK |
|
Broadcast |
|
3-Point |
$95 |
$295 |
$595 |
Brillion |
LSS6 |
6' 3-Point |
$225 |
$600 |
$1,800 |
Brillion |
SSBP-8 |
7' 3-Point |
$235 |
$700 |
$2,100 |
Brillion |
SSBP-10 |
10' Pull / 3-Point |
$250 |
$800 |
$2,400 |
Brillion |
SSBP-12 |
12' Pull / 3-Point |
$300 |
$900 |
$2,700 |
MAKE |
MODEL |
SPECS |
DAY |
WEEK |
4 WEEK |
|
Vermeer |
BX9000 |
3 pt., 1,000 RPM PTO |
$395 |
$1,175 |
$3,500 |
Haybuster |
2574 |
3 pt., 1,000 RPM PTO 360 Degree Discharge Spout |
$500 |
$1,500 |
$4,500 |
MAKE |
MODEL |
H.P. |
DESCRIPTION |
DAY |
WEEK |
4 WEEK |
|
Finn |
B70T |
34 |
Skid/Trailer |
$300 |
$750 |
$2,250 |
MAKE |
MODEL |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Woods |
BB60XC |
60" 3 pt. Mower |
$200 |
$600 |
$1,200 |
Woods |
BW1800XQ |
15' Batwing Mower |
$350 |
$1,000 |
$3,000 |
woods |
|
coming soon |
|
|
|
- Customer responsible for blade damage.
- Single shift rates.
- Double shift (8-16 hours/day) 1.5 x rate.
- Triple shift (16-24 hours/day) 2 x rate.
- P.M. service additional.
MAKE |
MODEL |
SPECS |
DAY |
WEEK |
4 WEEK |
|
Vermeer |
Vactron LP573SDT |
500 gal. Debris Tank 1,000 CFM Vacuum 4,000 psi @ 4gm |
$500 |
$1,500 |
$4,500 |
MAKE |
CAPACITY |
SPECS |
DAY |
WEEK |
4 WEEK |
|
Multiquip |
525 gal. Tank |
2" High Presure Pump, 250 ft. Head Pressure, 106 gpm, Trailer Mounted |
$100 |
$300 |
$900 |
Hotsy |
400 gal. Tank |
4,500 psi Heated Trailer Mounted Pressure Washer |
$175 |
$525 |
$1,575 |
MAKE |
MODEL |
SPECS |
WEEK |
4 WEEK |
|
Ford |
F450/F550 |
11' Contractor Box |
$750 |
$2,250 |
International |
7400SF |
14' Contractor Box, 4x4 |
$1,850 |
$5,500 |
Tandem Axle |
|
15'/16 yds. |
$1,925 |
$5,750 |
Tri-Axle |
|
16'/21 yds. |
$2,000 |
$6,000 |
- All On Road Vehicles subject to maximum monthly mileage allowance. Per mile fee maximum allowance based on vehicle type. Lessee is responsible for tire repair and routine maintenance at manufacturer's suggested intervals.
MAKE |
MODEL |
SPECS |
DESCRIPTION |
WEEK |
4 WEEK |
|
Ford |
F750 |
14-16 ft. |
Standard |
$1,200 |
$3,600 |
Ford |
F750 |
14-16 ft. |
Crew Cab |
$1,425 |
$4,250 |
Peterbilt |
348 |
14 ft. |
Tandem, 4x4 |
$1,850 |
$5,500 |
Peterbilt |
348 |
18 ft. |
Tandem, 6x6 |
$2,100 |
$6,250 |
- All On Road Vehicles subject to maximum monthly mileage allowance. Per mile fee maximum allowance based on vehicle type. Lessee is responsible for tire repair and routine maintenance at manufacturer's suggested intervals.
- All On Road Vehicles subject to maximum monthly mileage allowance. Per mile fee maximum allowance based on vehicle type. Lessee is responsible for tire repair and routine maintenance at manufacturer's suggested intervals.
MAKE |
MODEL |
SPECS |
DESCRIPTION |
4 WEEK |
|
Kenworth |
T880 |
13,200 lb. Front, 40,000 lb. Rear |
Tandem, Day Cab, 10 Speed Trans. |
$4,500 |
Kenworth |
T880 |
13,200 lb. Front, 40,000 lb. Rear |
Tandem, Day Cab, 10 Speed Trans., PTO Wet Kit |
$4,750 |
Kenworth |
T880 |
14,600 lb. Front, 46,000 lb. Rear |
Tandem Day Cab, 13 Speed Trans. |
$4,750 |
Kenworth |
T880 |
14,600 lb. Front, 46,000 lb. Rear |
Tandem, Day Cab, 13 Speed Trans., PTO Wet Kit |
$5,000 |
Kenworth |
T880 |
20,000 lb. Front, 46,000 lb. Rear |
Tandem, Day Cab, 18 Speed Trans. |
$5,050 |
Kenworth |
T880 |
20,000 lb. Front, 46,000 lb. Rear |
Tandem, Day Cab, 18 Speed Trans., PTO Wet Kit |
$5,250 |
Peterbilt |
348 |
14,600 lb. Front, 46,000 lb. Rear |
Tandem, Day Cab, 10 Speed Trans., 6x6 |
$6,750 |
Kenworth |
T880 |
20,000 lb. Front, 46,000 lb. Rear |
Tri-Axle, Day Cab, 18 Speed Trans. |
$5,500 |
Kenworth |
T880 |
20,000 lb. Front, 46,000 lb. Rear |
Tri-Axle, Day Cab, 18 Speed Trans., PTO Wet Kit |
$5,750 |
- On road vehicles subject to maximum monthly mileage allowance. Per mile fee and maximum allowance based on vehicle type. Lessee is responsible for tire repair and routine maintenance at manufacturer's suggested intervals.
- PTO Wet Kit additional $250 for 4 Weeks
MAKE |
MODEL |
CAPACITY |
SPECS |
DESCRIPTION |
WEEK |
4 WEEK |
|
Interstate |
G20DT |
20,000 lb. cap. |
24 ft. |
Gooseneck Beaver Tail |
$500 |
$1,500 |
Talbert |
AC-20 |
40,000 lb. cap. |
19 ft. |
Beaver Tail |
$650 |
$1,950 |
Interstate |
40DLA |
40,000 lb. cap. |
20 ft. |
Beaver Tail |
$650 |
$1,950 |
Talbert |
AC3-25 |
50,000 lb. cap. |
24 ft. |
Beaver Tail |
$825 |
$2,475 |
Interstate |
50DLA |
50,000 lb. cap. |
25 ft. |
Beaver Tail |
$825 |
$2,475 |
- All Trailers brake & tire wear to be assessed.
- All Trailers brake & tire wear to be assessed.
- All Trailers brake & tire wear to be assessed.
MAKE |
MODEL |
CAPACITY |
SPECS |
DAY |
WEEK |
4 WEEK |
|
Skytrak |
8042 |
8,000 lbs. |
42 ft. Reach |
$350 |
$900 |
$2,500 |
Skytrak |
10054 |
10,000 lbs. |
54 ft. Reach |
$450 |
$1,200 |
$3,600 |
JLG |
1255 |
12,000 lbs. |
55 ft. Reach |
$500 |
$1,500 |
$4,500 |
JLG |
1644 |
16,000 lbs. |
44 ft. Reach |
$675 |
$2,000 |
$6,000 |
MAKE |
MODEL |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Toyota |
8FDU25 |
5,000 lb. |
$175 |
$525 |
$1,575 |
Eaves |
E-225 |
22,000 lb. |
$700 |
$2,100 |
$5,500 |
Hoist |
P360 |
36,000 lbs. |
$825 |
$2,500 |
$7,500 |
- On-site assembly/disassembly fees apply.
MAKE |
MODEL |
SPECS |
DAY |
WEEK |
4 WEEK |
|
JLG |
1930ES |
19 ft. Platform Height |
$125 |
$250 |
$550 |
JLG |
2632ES |
26 ft. Platform Height |
$150 |
$300 |
$700 |
JLG |
260MRT |
26 ft. Platform, DSL, 4wd |
$250 |
$550 |
$1,650 |
JLG |
430LRT |
43 ft. Platform Height |
$250 |
$550 |
$1,650 |
MAKE |
MODEL |
SPECS |
DAY |
WEEK |
4 WEEK |
|
JLG |
340AJ |
34 ft. Articulating w/jib, DSL, 4wd |
$250 |
$550 |
$1,650 |
JLG |
450AJ |
45 ft. Articulating w/jib, DSL, 4wd |
$250 |
$550 |
$1,650 |
JLG |
460SJ |
46 ft. Telescoping w/ 6' jib, DSL, 4wd |
$250 |
$550 |
$1,650 |
JLG |
600AJ |
60 ft. Articulating, DSL, 4wd |
$325 |
$775 |
$2,325 |
JLG |
660SJ |
66 ft. Telescoping w/ 6' jib, DSL, 4wd |
$325 |
$775 |
$2,325 |
JLG |
660SJC |
66 ft. Telescoping, DSL, Crawler |
$450 |
$1,200 |
$3,600 |
JLG |
800S |
80 ft. Telescoping, DSL, 4wd |
$550 |
$1,500 |
$4,500 |
JLG |
800AJ |
80 ft. Telescoping, Articulating, DSL, 4wd |
$550 |
$1,500 |
$4,500 |
JLG |
860SJ |
86 ft. Telescoping w/ 6' jib, DSL, 4wd |
$550 |
$1,500 |
$4,500 |
JLG |
1350SJP |
135 ft. Telescoping w/6' jib, DSL, 4wd |
$750 |
$2,250 |
$6,500 |
JLG |
1500SJP |
150 ft. Telescoping, DSL, 4wd |
$2,500 |
$6,000 |
$15,000 |
- Sky Power Generators and Sky Welders available on most units.
MAKE |
MODEL |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Laymor |
300 |
8 ft. Angle Broom |
$195 |
$540 |
$1,650 |
Broce |
RCT350 |
8 ft. Angle Broom w/Blade |
$325 |
$975 |
$2,950 |
- Bristle wear charged at $125 per inch.
- Blade wear charge additional.
MAKE |
MODEL |
SPECS |
DAY |
WEEK |
4 WEEK |
|
Magnum |
MLT6S |
6,000 kW, Vertical Mast |
$125 |
$250 |
$500 |
Power-Zone Auto Start Units Available
- Single shift rates.
- Double shift (8-16 hours/day) 1.5 x rate.
- Triple shift (16-24 hours/day) 2 x rate.
- P.M. service additional.
- Single shift rates.
- Double shift (8-16 hours/day) 1.5 x rate.
- Triple shift (16-24 hours/day) 2 x rate.
- P.M. service additional.
- Remotes and leads available at additional cost.
MAKE |
MODEL |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Magnum |
MMG55 |
48 kW, 3 Phase, DSL |
$150 |
$400 |
$1,650 |
Magnum |
MMG75 |
86 kW, 3 Phase, DSL |
$200 |
$600 |
$1,800 |
Magnum |
MMG100D |
86 kW, 3 Phase, DSL |
$225 |
$650 |
$1,950 |
Magnum |
MMG120 |
102 kW, 3 Phase, DSL |
$250 |
$750 |
$2,250 |
Magnum |
MMG150D |
127 kW, 3 Phase, DSL |
$300 |
$900 |
$2,700 |
Magnum |
MMG185 |
177 kW, 3 Phase, DSL |
$365 |
$1,085 |
$3,250 |
Magnum |
MMG235D |
204 kW, 3 Phase, DSL |
$425 |
$1,250 |
$3,750 |
Magnum |
MMG320 |
278 kW, 3 Phase, DSL |
$575 |
$1,650 |
$4,950 |
- Single shift rates.
- Double shift (8-16 hours/day) 1.5 x rate.
- Triple shift (16-24 hours/day) 2 x rate.
- P.M. service additional.
MAKE |
MODEL |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Multi-Quip |
MVC88VTHW |
Plate Compactor |
$55 |
$200 |
$500 |
Multi-Quip |
MTX60H |
Jumping Jack |
$95 |
$275 |
$825 |
Multi-Quip |
MVH408DZ |
Reversible Plate Compactor |
$225 |
$795 |
$2,195 |
Multi-Quip |
RX157533 |
Articulating Trench Roller |
$235 |
$700 |
$2,100 |
MAKE |
MODEL |
CAPACITY |
DAY |
WEEK |
4 WEEK |
|
Ingersoll Rand |
P185 |
185 cfm @ 125 psi |
$125 |
$3,001 |
$750 |
Ingersoll Rand |
P185 w/Blast Pot |
185 cfm @ 125 psi |
$200 |
$525 |
$1,575 |
Ingersoll Rand |
XP375 |
375 cfm @ 125 psi |
$150 |
$450 |
$1,350 |
Ingersoll Rand |
XP825 |
825 cfm @ 125 psi |
$385 |
$1,150 |
$3,450 |
Ingersoll Rand |
HP1600 |
1600 cfm @ 150 psi |
$585 |
$1,750 |
$5,250 |
- Single shift rates.
- Double shift (8-16 hours/day) 1.5 x rate.
- Triple shift (16-24 hours/day) 2 x rate.
- P.M. service additional.
|